The Solution
Site Assessment and Consultation
Following initial discussions, Skyway carried out a detailed assessment of the roof layout, access points, and existing hazards at Dundalk Town Hall. This survey allowed the team to evaluate the most suitable combination of systems to ensure safe movement around the roof while protecting maintenance personnel from both edge and hatch-related risks.
Working collaboratively with the client, Skyway proposed an integrated roof safety solution combining Kee Guard and Kee Dome systems. This approach provided comprehensive protection while simplifying access procedures for those working at height.
Kee Guard Installation
The first element of the solution was the installation of a Kee Guard roof edge protection system. Kee Guard provides permanent, collective fall protection and allows personnel to access roof areas safely without relying solely on personal protective equipment.
The system was selected because of several key advantages:
- Collective protection for all roof users.
- A non-penetrative design, ensuring the roof surface remained intact and watertight.
- Fast and efficient installation with minimal disruption to building operations.
- Long-term durability and low maintenance requirements.
By installing Kee Guard around the relevant roof areas, Skyway created a safe working environment that aligned fully with current working-at-height regulations.
Kee Dome Installation
To address the risks associated with exposed roof hatches, Skyway installed Kee Dome systems over each hatch opening.
Kee Dome provides a fully enclosed protective barrier around roof hatches, effectively eliminating the danger of falls through openings. Unlike systems that rely on anchor points or personal fall arrest equipment, Kee Dome creates a permanent protective structure that simplifies safe access procedures.
The benefits of the Kee Dome system included:
- Complete enclosure of roof hatches.
- Elimination of fall-through risks.
- Reduced reliance on PPE and user training.
- Improved safety for maintenance and inspection personnel.
Together, the Kee Guard and Kee Dome systems created a fully integrated roof safety solution tailored to the building’s operational needs.
Installation and Coordination
Skyway coordinated the supply, delivery, and installation of all systems to ensure the project was completed efficiently and within the required timeframe.
By combining the expertise of its internal design and installation teams, Skyway maintained full quality control throughout the project and ensured all systems were installed in accordance with relevant Irish and EU safety standards.